Conveying equipment from the customer to determine the order to design selection, procurement, scheduling production cycle of about 20 days, the specific cycle determining factors are the design difficulty of the equipment itself, the difficulty, design cycle, delivery cycle is relatively long.
Conveyor belt design generally refers to the national corresponding standard reference manual, for example: bearing seat selection. Conveyor belt selection. Material coefficient of steel structure. Drive motor selection power and power supply V number, inverter parameters and brand.
The frame is manufactured by welding after the blanking, and the surface grinding process is checked to see if there is any weld cracking and other related procedures. The surface finish is processed after inspection. The surface treatment is divided into: carbon steel using surface phosphating spray or Galvanized, stainless steel finish is polished and brushed.
The production process of the drive roller is more precise and requires finishing processing. The first machining equipment is a CNC lathe, which is more efficient than the original lathe, with less accurate accuracy and less error. It is widely used in many precision machining industry CNC lathes.
Conveyor belt selection is directly related to the customer’s products. Commonly used conveyor belts are: PVC flat belt PVC non-slip grass belt PVC skirt conveyor belt PVC white food grade conveyor belt black rubber belt PU food grade conveyor belt acid and alkali conveyor belt (The product brand of conveyor belt material is differently conveyed separately, the common factory conveyor belt is PVC conveyor belt)
The choice of idler roller is usually made by unpowered roller. The diameter is 38.0mm* thickness 2.0mm. The surface is polished and galvanized. The tapping teeth at both ends of the shaft are easy to bolt.
Equipment assembly requires professional personnel to assemble the equipment. The assembly process needs to be careful not to bump and avoid scratching the paint.